An overland flow path is the route surface water takes across the ground when heavy rain is more than the soil, gutters and pipes can take. It follows the natural low points of the land: gullies, swales, road corridors and sometimes back yards.
A LIM (land information memorandum) must include the natural hazard information the council holds about the land, including flooding and inundation. A note about an overland flow path usually means the council's own modelling or mapping shows surface water routing across or near the property.
What to do with it:
| Tier | Upstream catchment | Typical feature |
|---|---|---|
| T1 | Over 5,000 ha | Major rivers |
| T2 | 500 to 5,000 ha | Rivers and major streams |
| T3 | 25 to 500 ha | Streams |
| T4 | 2 to 25 ha | Minor watercourses |
| T5 | Under 2 ha | Small overland flow paths |
Tier 5 goes down to catchments of about 0.1 ha on the native 1 m grid and about 0.2 ha on the 2 to 4 m grid. See the methodology for sources and limitations.
If you need something to hand to a council, a buyer or a designer, there are two levels: a map extract of the flow paths at the property with the source, method and date stated, or an engineer's review of what the flow path means for the site and what to do about it.
Send the address and what it's for (a purchase, a building consent, a council request). You'll get a reply within one business day saying what level of assessment fits and what it costs.
The route surface water takes across the ground when heavy rain is more than the soil, gutters and pipes can take. It follows the natural low points of the land.
Search the address on FloodMap.nz to see modelled flow paths, and check your council's flood maps and the property's LIM. An engineer can confirm what a flow path means for the site.
The council holds information showing surface water could route across or near the property in heavy rain. It is not a finding that the house floods. Check where the path crosses the site and ask the council what it requires for building work there.
Usually not without council approval and a design that keeps the flow path working. Rules differ by council; in Auckland, Chapter E36 of the Unitary Plan sets rules for buildings and works within overland flow paths.