Reports and prices

Flood reports for a property, at a fixed price.

From a printout of the flow paths to an engineer's review or a full flood model. Nationwide, wherever LINZ has flown LiDAR. Prepared by Andre Magdich CPEng through SAE Ltd.

No engineering opinion

Flow path printout

$95 incl. GST
Usually 5 working days
  • A PDF map of the overland flow paths and potential ponding at and around the property
  • Each path's tier and upstream catchment area
  • The data source, method and date stated, so it can be cited

Good for your records, a designer or builder, or making sense of a LIM note.

Order and pay: $95 incl. GST

Pay by card, Apple Pay or Google Pay and enter the property address at checkout. If we can't produce a printout for the property, we refund you in full.

For consent and floor levels

Site-specific flood modelling

from $4,500 + GST
Single residential lot. Quoted per site
  • HEC-RAS 2D model of the site and its catchment
  • Flood depth, velocity and hazard, and flood levels at the property for floor-level setting
  • Before-and-after comparison for proposed earthworks where needed
  • CPEng-signed report for resource or building consent

Fixed quote after a desktop review; the review fee is credited against the modelling. What's covered

Ask for a quote

How it works

Flow path printout: order and pay above by card, with the property address. Desktop review or modelling: order below with the address and what the report is for.
For a review or modelling, we confirm the scope and price by email within one business day, and nothing is charged until you agree. Our report terms apply.
Your report arrives by email as a PDF.

Order or ask for a price

Urgent? Phone Andre on 027 604 4015.

Reports are provided under our report terms. We use these details only to reply to your order. The form is delivered to us through Formspree. See our Privacy Policy.

Questions

Can I use the desktop review for a consent?

It's a screening review. Where a council requires a site-specific flood assessment for a consent, that is usually the modelling option. The review tells you whether you need it, and its fee is credited if you go ahead.

Who can rely on the report?

The person who orders it. If a buyer, lender or council needs to rely on it too, ask for a reliance letter when you order.

Which areas do you cover?

All of New Zealand, wherever LINZ has flown LiDAR. The desktop review also uses the flood information your council publishes, which varies by district.

Is the free map enough?

For a first look, often yes. A report is for when you need a record you can hand on, or an engineer's view on what it means for the property.